旭灿电子
Brilliance
Brilliance

Sitemap     |     News     |     CN

Copyright © 2011 Brilliance All Rights Reserved. 粤ICP备05064644号         Online consultation: Mr. Zhang:13509628742     Mr. Huang:13828820104     Mr. Zhou:15050488787
Shenzhen Head Office Address: Area B, 2nd Floor, Building 5, Huangtian Industrial City, Yangbei Industrial Zone, Xixiang Street, Baoan District, Shenzhen, Guangdong, China 

Tel:(86)0755 - 83323759          Fax:(86)755 - 83323758
Suzhou Office Address: 1st Floor, Building A4, Jinqiao Auto Parts Industrial Park, No. 1258, Jinfeng South Road, Wuzhong District, Suzhou, Jiangsu, China   

Tel:(86)0512 - 66582912            Fax:(86)0512 - 66582913         Powered by www.300.cn

 
 
 

Shenzhen:(86)0755 - 83323759
Suzhou:(86)0512 - 66582912

 
 

Sweep and follow us

 
 
Page view:

Factory overall planning and layout

 
 

According to the actual situation of the customer's factory and customer requirements, each functional area is divided.

1. Design equipment access channels, incoming materials, finished products, entrances and exits, employees and visits.
2. Design office and operator areas and permissions and rest areas.
3. Design electrical usage and reasonable layout.
4. Design the incoming materials, product production, finished product storage and delivery process.
5. Design the production line flow direction and line body distance to ensure the convenience of material passage, production operation, equipment maintenance and maintenance.
6. Design fire safety and escape routes, managed by a dedicated person.

Improper material and traceability system solutions

 
 

Plan the layout in advance according to the equipment production line configuration.

1. Design the equipment flow direction and horizontal reference line, the main equipment avoids the support column, and the center of gravity is placed on the beam.
2. Design the front and back space of the equipment, material storage and semi-finished product placement area.
3. Design the electrical circuit to ensure that the factory is clean and beautiful and easy to handle.
4. Designed to reserve the distance between the lines, to ensure convenient production and equipment maintenance.
5. Design equipment power independent and safety control.

Non-standard automation solution factory

 
 

Designing an MES system that is more convenient to manage and produce according to factory planning and existing production lines

1. Control the time, quantity, and direction of material in and out.
2. Control and check the data of materials and actual production products and line bodies.
3. Control the line body to produce data in real time, effectively schedule and schedule production in advance.
4. The management operator misunderstands and clarifies the responsibility to ensure that the next process is correct.
5. The production data of the control equipment shall be corrected in time, and the equipment shall be repaired and maintained in batches in advance.
6. Grade management of production data, real-time analysis, processing, and signing of various documents to effectively improve work efficiency.
7. Product quality can be traced back to all aspects and can be handled and responded in a timely manner.